Level 1 vs Level 2 chargers — what the difference means for wiring

A Level 1 charger plugs into a standard 120V outlet (the same as any household appliance) and delivers roughly 1.4 kW — enough to add 8–12 km of range per hour. No special wiring is needed beyond the existing outlet circuit.

A Level 2 charger runs on 240V and delivers 7–12 kW, adding 40–80 km of range per hour. It requires a dedicated 240V circuit, a new double-pole breaker in your electrical panel, proper gauge wire run from the panel to the charger location, and an electrical permit in every Canadian province. This is the installation most homeowners are planning when they buy an EV.

CEC requirements for Level 2 EV charger circuits

EV charging circuits in Canada are governed by CEC C22.1-21 Rule 86-306. The key requirements:

Wire size, breaker size, and outlet type by charger amperage

Charger (EVSE)Circuit requiredBreakerWire (copper)Outlet
32A EVSE (7.2 kW)40A dedicated40A double-pole8 AWG copperNEMA 14-50 or hardwired
40A EVSE (9.6 kW)50A dedicated50A double-pole6 AWG copperNEMA 14-50 or hardwired
48A EVSE (11.5 kW)60A dedicated60A double-pole4 AWG copperHardwired only

Source: CEC C22.1-21 Table 2 (ampacity), Rule 86-306 (EV circuit requirements), Rule 8-104 (continuous load 125% rule). Wire must be T90 or RW90 rated.

Do you need a permit? Yes — in every province

An electrical permit is mandatory for a Level 2 EV charger installation in all 10 provinces and 3 territories. The permit must be pulled before work begins, and the installation must pass an electrical inspection before the circuit is energized and the charger used.

In Ontario, the inspection authority is the Electrical Safety Authority (ESA). In BC, it is BC Safety Authority (BCSA). In Alberta, inspections are handled by private certified electrical inspection agencies. In Quebec, inspections are done by the Régie du bâtiment (RBQ).

A charger installed without a permit is a serious risk: your home insurer may deny a fire claim if non-permitted electrical work is the cause. Permit fees typically run $75–$200 depending on province, and an electrical inspection is included.

Check your panel capacity before booking the installation

A Level 2 EV charger on a 50A circuit adds approximately 12 kW of demand — a significant load. Before the electrician arrives, check whether your panel has the capacity. A 100A service (still common in homes built before 1985) may already be at or near its limit if you have electric heating, an electric range, or an electric dryer.

If your panel is full or your service is 100A or less, the electrician may recommend a panel upgrade to 200A before proceeding. Budget $3,000–$6,000 for a 200A panel upgrade including permit and inspection in most Canadian cities.

Find the right wire size for your run length: Wire Size Calculator (CEC Table 2) →
Confirm your breaker size: Circuit Breaker Sizing Calculator →
Check if your panel has capacity: Electrical Load Calculator (CEC Rule 8-200) →

Frequently asked questions

Do I need a permit to install a Level 2 EV charger in Canada?
Yes. An electrical permit is required in every province and territory in Canada for a Level 2 EV charger installation. The installation must be done by a licensed electrician and pass an inspection by the local electrical authority. In Ontario, this is the Electrical Safety Authority (ESA). In BC, it is BC Safety Authority. Permit fees range from approximately $75 to $200 depending on the province. A charger installed without a permit is uninsured in the event of a fire or damage claim.
What wire size do I need for a Level 2 EV charger in Canada?
For a 40A Level 2 charger circuit: 8 AWG copper wire minimum (CEC Table 2, 40A ampacity). For a 50A circuit: 6 AWG copper minimum. CEC Rule 86-306 requires a dedicated circuit — the EV charger cannot share a circuit with any other load. The wire must be rated for 90°C (T90 or RW90 designation in Canada). Always confirm the charger's nameplate amperage and use that to determine the circuit size.
What breaker size do I need for a Level 2 EV charger?
EV chargers are continuous loads (they run for more than 3 hours). Under CEC Rule 8-104, continuous loads must not exceed 80% of the breaker rating. So a 32A charger requires a 40A breaker (32/0.8 = 40A). A 40A charger requires a 50A breaker. Most installers use a 50A double-pole breaker with a 40A EVSE (Electric Vehicle Supply Equipment) to give flexibility for future higher-amperage vehicles.

Code reference

Need a licensed electrician for your EV charger?

Get connected with a CEC-certified electrician in your area who can pull the permit, run the circuit, and pass inspection.

✓ Free    ✓ No obligation    ✓ Licensed contractors only